Lithium Ion Battery Electrode Coating Coater Equipment with Dryer
Basic Info
Model NO. | TMAX-JK-TMJ-200 |
Trademark | TMAX |
Origin | China |
HS Code | 8479899990 |
Production Capacity | 10000/Year |
Product Description
Lithium Ion Battery Electrode Coating Coater Equipment With Dryer
1 TMAX-JK-TMJ-200 Film coating machine with dryer is used for varies kinds of materials coating.
It is supplied with vacuum pump and heating system, having an precision heating temperature upto 200ºC.
2 Thefilm coating machineis mainly used for lithium battery electrode coating for coin cell assemble and pouch cell research.
3 Thefilm coating machineis mainly used for lithium battery electrode coating for coin cell assemble and pouch cell research.
4 Build-in oil-less vacuum pump make the machine with small volume and less noise.
5 New designed Touch Screen control make the operating more easy and simple
Specifications
Machine model | Automatic Film Coating Machine TMAX-JK-TMJ-200 |
Product introduction | This product is widely used in various kinds of high temperature coating research, such as ceramic film, crystal film, battery material film, special nano film;The development of science and technology that can adapt to the future of film formation under high temperature conditions. |
main features | 1. Adopt large area uniform heating to ensure high precision uniform temperature in cavity. 2. Flat plate coating, motor driven scraper coating, coating speed is stable and adjustable. 3. Film speed adjustable, vacuum aluminum plate can be quickly placed or removed copper foil, aluminum foil, etc., built-in vacuum pump or access to external vacuum source, substrate adsorption without deformation. 4. Standard preparation of film, coating precision, coating thickness adjustable. 5. Can be used in glove box, easy to operate, small size, can save space. 6. PLC. Touch screen control parameters are easy to set. |
Coating method | Flat plate coating, standard equipped withTOB-KTQ-250s film maker, film width 250mm(can be increased), optional scraper and other metering device (manual scraping); |
Coating Stroke | About 300mm, the stroke is set and adjusted in the touch screen stepless |
Coating Driven | Motor driven, coating speed in the touch screen stepless setting adjustment |
Dimension(L*W*H) | L550mm×W450mm×H320mm |
Coating Speed | 0~120mm/s(Such as iron phosphate lithium slurry) |
Vacuum plate | Aluminum plate with vacuum |
Warranty | One Year limited warranty with lifetime support |
Size of Vacuum plate | L415mm×W300mm×H32mm |
Blade thickness adjustable range | 0~6mm adjustable |
precision | ±3 um, the optional table shows 1 um micrometer |
Heating drying system | Room temperature ~ 130ºC, digital display temperature controller, precision±1ºC |
Vacuum pump | 1 built-in oil-free vacuum pump |
Power | 220V/50Hz |
Weight | 70KG |
Operating procedures | 1. Put the Electrode on the vacuum plate, start the power supply, open the vacuum, the electrode adsorption on the vacuum plate. 2. Place the film applicator on the electrode and add the coating slurry. 3. Open the film, the film device automatically pushes the film applicator to move, automatic film. 4. Take out the film applicator and push rod, cover with the heating cap, set the heating temperature and time, and heat and dry. 5. After drying, open the heat cover, take out the coated film electrode, film device reset complete. |
Maintenance method and matters needing attention | 1. Every time before work to use a soft cloth with alcohol carefully wipe the film head, the body, keep clean. 2. Film head, differentiator and other high-precision parts of the use do not collide, gently take gently, differentiator to adjust the left and right to be symmetrical and even. 3. Regularly check screws, nuts, pins and other fasteners in various parts to prevent looseness and prevent product quality accidents. |
PACKAGE:
1 Standard exported package: Internal anticollision protection, external export wooden box packaging.2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.
3 Responsible for the damage during the shipping process, will change the damage part for you for free.
DELIVERY TIME:15-20 days after confirming order,detail delivery date should be decided according to production season and order quantity.